The LHC lies in a tunnel 27 kilometres (17 mi) in circumference, as much as 175 metres (574 ft) beneath the Franco-Swiss border near Geneva, Switzerland. This synchrotron is designed to collide opposing particle beams of either protons at an energy of 7 teraelectronvolts (1.12 microjoules) per particle, or lead nuclei at an energy of 574 TeV (92.0 µJ) per nucleus.[1][2] The term hadron refers to particles composed of quarks.
The Large Hadron Collider was built by the European Organization for Nuclear Research (CERN) with the intention of testing various predictions of high-energy physics, including the existence of the hypothesized Higgs boson[3] and of the large family of new particles predicted by supersymmetry.[4] It is funded by and built in collaboration with over 10,000 scientists and engineers from over 100 countries as well as hundreds of universities and laboratories.[5]
On 10 September 2008, the proton beams were successfully circulated in the main ring of the LHC for the first time,[6] but 9 days later operations were halted due to a serious fault.[7] On 20 November 2009 they were successfully circulated again,[8] with the first proton–proton collisions being recorded 3 days later at the injection energy of 450 GeV per beam.[9] After the 2009 winter shutdown, the LHC was restarted and the beam was ramped up to 3.5 TeV per beam,[10] half its designed energy.[11] On 30 March 2010, the first planned collisions took place between two 3.5 TeV beams, which set a new world record for the highest-energy man-made particle collisions.[12]
Contents[hide] |
[edit] Purpose
Physicists hope that the LHC will help answer many of the most fundamental questions in physics: questions concerning the basic laws governing the interactions and forces among the elementary objects, the deep structure of space and time, especially regarding the intersection of quantum mechanics and general relativity, where current theories and knowledge are unclear or break down altogether. These issues include, at least:[13]- Is the Higgs mechanism for generating elementary particle masses via electroweak symmetry breaking indeed realised in nature?[14] It is anticipated that the collider will either demonstrate or rule out the existence of the elusive Higgs boson(s), completing (or refuting) the Standard Model.[15][16][17]
- Is supersymmetry, an extension of the Standard Model and Poincaré symmetry, realised in nature, implying that all known particles have supersymmetric partners?[18][19][20]
- Are there extra dimensions,[21] as predicted by various models inspired by string theory, and can we detect them?[22]
- What is the nature of the Dark Matter which appears to account for 23% of the energy density of the Universe?
- Are electromagnetism, the strong nuclear force and the weak nuclear force just different manifestations of a single unified force, as predicted by various Grand Unification Theories?
- Why is gravity so many orders of magnitude weaker than the other three fundamental forces? See also Hierarchy problem.
- Are there additional sources of quark flavour mixing, beyond those already predicted within the Standard Model?
- Why are there apparent violations of the symmetry between matter and antimatter? See also CP violation.
- What was the nature of the quark-gluon plasma in the early universe? This will be investigated by heavy ion collisions in ALICE.
[edit] Design
The LHC is the world's largest and highest-energy particle accelerator.[1][23] The collider is contained in a circular tunnel, with a circumference of 27 kilometres (17 mi), at a depth ranging from 50 to 175 metres (160 to 574 ft) underground.The 3.8-metre (12 ft) wide concrete-lined tunnel, constructed between 1983 and 1988, was formerly used to house the Large Electron–Positron Collider.[24] It crosses the border between Switzerland and France at four points, with most of it in France. Surface buildings hold ancillary equipment such as compressors, ventilation equipment, control electronics and refrigeration plants.
The collider tunnel contains two adjacent parallel beam pipes that intersect at four points, each containing a proton beam, which travel in opposite directions around the ring. Some 1,232 dipole magnets keep the beams on their circular path, while an additional 392 quadrupole magnets are used to keep the beams focused, in order to maximize the chances of interaction between the particles in the four intersection points, where the two beams will cross. In total, over 1,600 superconducting magnets are installed, with most weighing over 27 tonnes. Approximately 96 tonnes of liquid helium is needed to keep the magnets at their operating temperature of 1.9 K (−271.25 °C), making the LHC the largest cryogenic facility in the world at liquid helium temperature.
Once or twice a day, as the protons are accelerated from 450 GeV to 7 TeV, the field of the superconducting dipole magnets will be increased from 0.54 to 8.3 teslas (T). The protons will each have an energy of 7 TeV, giving a total collision energy of 14 TeV. At this energy the protons have a Lorentz factor of about 7,500 and move at about 0.999999991 c, or about 3 metres per second slower than the speed of light (c).[25] It will take less than 90 microseconds (μs) for a proton to travel once around the main ring – a speed of about 11,000 revolutions per second. Rather than continuous beams, the protons will be bunched together, into 2,808 bunches, so that interactions between the two beams will take place at discrete intervals never shorter than 25 nanoseconds (ns) apart. However it will be operated with fewer bunches when it is first commissioned, giving it a bunch crossing interval of 75 ns.[26] The design luminosity of the LHC is 1034 cm−2s−1, providing a bunch collision rate of 40 MHz.[27]
Prior to being injected into the main accelerator, the particles are prepared by a series of systems that successively increase their energy. The first system is the linear particle accelerator LINAC 2 generating 50-MeV protons, which feeds the Proton Synchrotron Booster (PSB). There the protons are accelerated to 1.4 GeV and injected into the Proton Synchrotron (PS), where they are accelerated to 26 GeV. Finally the Super Proton Synchrotron (SPS) is used to further increase their energy to 450 GeV before they are at last injected (over a period of 20 minutes) into the main ring. Here the proton bunches are accumulated, accelerated (over a period of 20 minutes) to their peak 7-TeV energy, and finally circulated for 10 to 24 hours while collisions occur at the four intersection points.[28]
The LHC physics program is mainly based on proton–proton collisions. However, shorter running periods, typically one month per year, with heavy-ion collisions are included in the program. While lighter ions are considered as well, the baseline scheme deals with lead ions[29] (see A Large Ion Collider Experiment). The lead ions will be first accelerated by the linear accelerator LINAC 3, and the Low-Energy Ion Ring (LEIR) will be used as an ion storage and cooler unit. The ions will then be further accelerated by the PS and SPS before being injected into LHC ring, where they will reach an energy of 2.76 TeV per nucleon (or 575 TeV per ion), higher than the energies reached by the Relativistic Heavy Ion Collider. The aim of the heavy-ion program is to investigate quark–gluon plasma, which existed in the early universe.
[edit] Detectors
Six detectors have been constructed at the LHC, located underground in large caverns excavated at the LHC's intersection points. Two of them, the ATLAS experiment and the Compact Muon Solenoid (CMS), are large, general purpose particle detectors.[23] A Large Ion Collider Experiment (ALICE) and LHCb, have more specific roles and the last two, TOTEM and LHCf, are very much smaller and are for very specialized research. The BBC's summary of the main detectors is:[30]Detector | Description |
---|---|
ATLAS | one of two general purpose detectors. ATLAS will be used to look for signs of new physics, including the origins of mass and extra dimensions. |
CMS | the other general purpose detector will, like ATLAS, hunt for the Higgs boson and look for clues to the nature of dark matter. |
ALICE | is studying a "fluid" form of matter called quark–gluon plasma that existed shortly after the Big Bang. |
LHCb | equal amounts of matter and antimatter were created in the Big Bang. LHCb will try to investigate what happened to the "missing" antimatter. |
[edit] Operational timeline
The first beam was circulated through the collider on the morning of 10 September 2008.[30] CERN successfully fired the protons around the tunnel in stages, three kilometres at a time. The particles were fired in a clockwise direction into the accelerator and successfully steered around it at 10:28 local time.[31] The LHC successfully completed its first major test: after a series of trial runs, two white dots flashed on a computer screen showing the protons travelled the full length of the collider. It took less than one hour to guide the stream of particles around its inaugural circuit.[32] CERN next successfully sent a beam of protons in a counterclockwise direction, taking slightly longer at one and a half hours due to a problem with the cryogenics, with the full circuit being completed at 14:59. In the original timeline of the LHC commissioning, the first "modest" high-energy collisions at a center-of-mass energy of 900 GeV were expected to take place before the end of September 2008, and the LHC was expected to be operating at 10 TeV by the time of the official inauguration on 21 October 2008.[33] However, due to the delay caused by the above-mentioned incident, the collider was not operational until November 2009.[34] Despite the delay, LHC was officially inaugurated on 21 October 2008, in the presence of political leaders, science ministers from CERN's 20 Member States, CERN officials, and members of the worldwide scientific community.[35]On 19 September 2008, a quench occurred in about 100 bending magnets in sectors 3 and 4, causing a loss of approximately six tonnes of liquid helium, which was vented into the tunnel, and a temperature rise of about 100 kelvin in some of the affected magnets. Vacuum conditions in the beam pipe were also lost.[36] Shortly after the incident CERN reported that the most likely cause of the problem was a faulty electrical connection between two magnets, and that – due to the time needed to warm up the affected sectors and then cool them back down to operating temperature – it would take at least two months to fix it.[37] Subsequently, CERN released a preliminary analysis of the incident on 16 October 2008,[38] and a more detailed one on 5 December 2008.[39] Both analyses confirmed that the incident was indeed initiated by a faulty electrical connection. A total of 53 magnets were damaged in the incident and were repaired or replaced during the winter shutdown.[40]
Most of 2009 was spent on repairs and reviews from the damage caused by the quench incident. On November 20, the first low-energy beams circulated in the tunnel for the first time since the incident. The early part of 2010 saw the continue ramp-up of beam in energies and early physic experiments. On 30 March 2010, LHC set a record for high-energy collisions, by colliding proton beams at a combined energy level of 7 TeV. The attempt was the third that day, after two unsuccessful attempts in which the protons had to be "dumped" from the collider and new beams had to be injected.[41] CERN has declared a schedule to operate the LHC through the rest of 2010 and most of 2011 before the next scheduled shutdown.[42] The first proton run ended on 4 November 2010. A run with lead ions started on 8 November 2010, and it will continue until early December 2010.[43] This allows the ALICE experiment to study matter under extreme conditions similar to those shortly after the Big Bang.[44]
Date | Event |
---|---|
10 Sep 2008 | CERN successfully fired the first protons around the entire tunnel circuit in stages. |
19 Sep 2008 | Magnetic quench occurred in about 100 bending magnets in sectors 3 and 4, causing a loss of approximately 6 tonnes of liquid helium. |
30 Sep 2008 | First "modest" high-energy collisions planned but postponed due to accident. |
16 Oct 2008 | CERN released a preliminary analysis of the incident. |
21 Oct 2008 | Official inauguration. |
5 Dec 2008 | CERN released detailed analysis. |
20 Nov 2009 | Low-energy beams circulated in the tunnel for the first time since the incident.[45] |
23 Nov 2009 | First particle collisions in all four detectors at 450 GeV.[9] |
30 Nov 2009 | LHC becomes the world's highest-energy particle accelerator achieving 1.18 TeV per beam, beating the Tevatron's previous record of 0.98 TeV per beam held for eight years.[46] |
28 Feb 2010 | The LHC continues operations ramping energies to run at 3.5 TeV for 18 months to two years, after which it will be shut down to prepare for the 14 TeV collisions (7 TeV per beam).[47] |
30 Mar 2010 | The two beams collided at 7 TeV (3.5 TeV per beam) in the LHC at 13:06 CEST, marking the start of the LHC research program. |
8 Nov 2010 | Start of the first run with lead ions. |
[edit] Findings
CERN scientists estimate that, if the Standard Model is correct, a single Higgs boson may be produced every few hours. At this rate, it may take about two to three years to collect enough data to discover the Higgs boson unambiguously. Similarly, it may take one year or more before sufficient results concerning supersymmetric particles have been gathered to draw meaningful conclusions.[1] On the other hand, some extensions of the Standard Model predict additional particles, such as the heavy W' and Z' gauge bosons, whose existence might already be probed after a few months of data taking.[48]The first physics results from the LHC, involving 284 collisions which took place in the ALICE detector, were reported on 15 December 2009.[49] The results of the first proton–proton collisions at energies higher than Fermilab's Tevatron proton–antiproton collisions were published by the CMS collaboration in early February 2010, yielding greater-than-predicted charged-hadron production.[50] The CMS paper reports that the increase in the production rate of charged hadrons (mostly kaons and pions) when the center-of-mass energy goes from 0.9 TeV to 2.36 TeV exceeds by roughly 10% the predictions of the theoretical models used in the analysis.[51]
[edit] Proposed upgrade
Main article: Super Large Hadron Collider
After some years of running, any particle physics experiment typically begins to suffer from diminishing returns: each additional year of operation discovers less than the year before. The way around the diminishing returns is to upgrade the experiment, either in energy or in luminosity. A luminosity upgrade of the LHC, called the Super LHC, has been proposed,[52] to be made after ten years of LHC operation.The optimal path for the LHC luminosity upgrade includes an increase in the beam current (i.e., the number of protons in the beams) and the modification of the two high-luminosity interaction regions, ATLAS and CMS. To achieve these increases, the energy of the beams at the point that they are injected into the (Super) LHC should also be increased to 1 TeV. This will require an upgrade of the full pre-injector system, the needed changes in the Super Proton Synchrotron being the most expensive.
[edit] Cost
With a budget of 9 billion US dollars (approx. €7.5bn or £6.19bn as of Jun 2010), the LHC is one of the most expensive scientific instruments[53] ever built.[54] The total cost of the project is expected to be of the order of 4.6bn Swiss francs (approx. $4.4bn, €3.1bn, or £2.8bn as of Jan 2010) for the accelerator and SFr 1.16bn (approx. $1.1bn, €0.8bn, or £0.7bn as of Jan 2010) for the CERN contribution to the experiments.[55]The construction of LHC was approved in 1995 with a budget of SFr 2.6bn, with another SFr 210M towards the experiments. However, cost overruns, estimated in a major review in 2001 at around SFr 480M for the accelerator, and SFr 50M for the experiments, along with a reduction in CERN's budget, pushed the completion date from 2005 to April 2007.[56] The superconducting magnets were responsible for SFr 180M of the cost increase. There were also further costs and delays due to engineering difficulties encountered while building the underground cavern for the Compact Muon Solenoid,[57] and also due to faulty parts provided by Fermilab.[58] Due to lower electricity costs during the summer, it is expected that the LHC will normally not operate over the winter months,[59] although an exception was made to make up for the 2008 start-up delays over the 2009/10 winter.
[edit] Computing resources
Data produced by LHC as well as LHC-related simulation will produce a total data output of 15 petabytes per year (max throughput while running not stated).[60]The LHC Computing Grid[61] is being constructed to handle the massive amounts of data produced. It incorporates both private fiber optic cable links and existing high-speed portions of the public Internet, enabling data transfer from CERN to academic institutions around the world.
The Open Science Grid is used as the primary infrastructure in the United States, and also as part of an interoperable federation with the LHC Computing Grid.
The distributed computing project http://en.wikipedia.org/wiki/LHC@home was started to support the construction and calibration of the LHC. The project uses the BOINC platform, enabling anybody with an internet connection to use their computer idle time to simulate how particles will travel in the tunnel. With this information, the scientists will be able to determine how the magnets should be calibrated to gain the most stable "orbit" of the beams in the ring.
[edit] Safety of particle collisions
The experiments at the Large Hadron Collider sparked fears among the public that the particle collisions might produce doomsday phenomena, involving the production of stable microscopic black holes or the creation of hypothetical particles called strangelets.[62] Two CERN-commissioned safety reviews examined these concerns and concluded that the experiments at the LHC present no danger and that there is no reason for concern,[63][64][65] a conclusion expressly endorsed by the American Physical Society.[66][edit] Operational challenges
The size of the LHC constitutes an exceptional engineering challenge with unique operational issues on account of the amount of energy stored in the magnets and the beams.[28][67] While operating, the total energy stored in the magnets is 10 GJ (equivalent to 2.4 tons of TNT) and the total energy carried by the two beams reaches 724 MJ (173 kilograms of TNT).[68]Loss of only one ten-millionth part (10−7) of the beam is sufficient to quench a superconducting magnet, while the beam dump must absorb 362 MJ (87 kilograms of TNT) for each of the two beams. These energies are carried by very little matter: under nominal operating conditions (2,808 bunches per beam, 1.15×1011 protons per bunch), the beam pipes contain 1.0×10−9 gram of hydrogen, which, in standard conditions for temperature and pressure, would fill the volume of one grain of fine sand.
[edit] Construction accidents and delays
Wikinews has related news: CERN says repairs to LHC particle accelerator to cost €16.6 million |
- On 25 October 2005, José Pereira Lages, a technician, was killed in the LHC when a switchgear that was being transported fell on him.[69]
- On 27 March 2007 a cryogenic magnet support broke during a pressure test involving one of the LHC's inner triplet (focusing quadrupole) magnet assemblies, provided by Fermilab and KEK. No one was injured. Fermilab director Pier Oddone stated "In this case we are dumbfounded that we missed some very simple balance of forces". This fault had been present in the original design, and remained during four engineering reviews over the following years.[70] Analysis revealed that its design, made as thin as possible for better insulation, was not strong enough to withstand the forces generated during pressure testing. Details are available in a statement from Fermilab, with which CERN is in agreement.[71][72] Repairing the broken magnet and reinforcing the eight identical assemblies used by LHC delayed the startup date, then planned for November 2007.
- Problems occurred on 19 September 2008 during powering tests of the main dipole circuit, when an electrical fault in the bus between magnets caused a rupture and a leak of six tonnes of liquid helium. The operation was delayed for several months.[73] It is currently believed that a faulty electrical connection between two magnets caused an arc, which compromised the liquid-helium containment. Once the cooling layer was broken, the helium flooded the surrounding vacuum layer with sufficient force to break 10-ton magnets from their mountings. The explosion also contaminated the proton tubes with soot.[39][74] This accident was more recently thoroughly discussed in a 22 February 2010 Superconductor Science and Technology article by CERN physicist Lucio Rossi.[75]
- Two vacuum leaks were identified in July 2009, and the start of operations was further postponed to mid-November 2009.[76]